Appendix
Water Quality Assessment of the Interim Operations Plan:
Phosphorus Concentrations & Loads
prepared for
U.S. Department of the Interior Everglades National Park
by
William W. Walker, Jr, Ph.D.
January 2004
Download Main Report (4.2 mb)
Other Everlades Reports prepared for Dept. of the Interior 05/27/2004